Commercial construction
Steel erection for commercial construction
A subcontract scope for GCs and CMs who already have a fabricator, or who need an erector named in the bid. The steel itself is furnished by others.

How this sits in the bid
Commercial teams usually separate fabrication from erection. This business is the erection side. Send the erection drawings, the bid date if you have one, and the city where the building will stand.
The response, when the package is complete enough, is a quote for setting and bolting the frame. It is not a fabrication number and not a full building price.
- Bid-stage and post-award erection reviews
- Frames for offices, retail, and mixed-use buildings
- Coordination items called out before mobilization
- Exclusions written in plain language
Related pages
Warehouses
Structural frames for warehouse buildings. Panels, roofing, and racking are not part of the offer.
Industrial Buildings
Structural steel frames for industrial buildings. Process equipment and fabrication stay outside the erection quote.
Distribution Centers
High-bay distribution frames where the structural steel is supplied complete and ready to erect.