Structural steel erection
Structural steel erection in Massachusetts
Frame erection for projects whose steel arrives cut, drilled, and piece-marked. The work is to unload, set, plumb, and bolt the frame to the erection drawings.

The erection scope
A typical package includes columns, beams, and the bracing shown on the erection drawings. Pieces are set in the sequence the frame needs for stability, then bolted at the connections the drawings call for.
Crane-assisted placement is part of planning when a pick exceeds what the site can handle by other means. Crane hire is identified in the quote. This site does not claim that cranes are owned.
- Review of erection drawings and piece marks
- Setting prepared columns, beams, and bracing
- Plumbing the frame and bolt-up of specified connections
- Coordination with the general contractor on access and picks
What speeds up a number
Send the current erection set, the project address, an approximate floor area, and a start window. Estimated tonnage is optional and useful.
If anchor bolts are already in, say so. If the survey is still open, the quote can note that the start depends on it.
Can you erect steel you did not fabricate?
Yes. That is the model. The fabricator or the owner supplies the members. The erection scope starts when those members are ready to set.