Distribution center steel erection
Distribution buildings need long, repetitive frames and a schedule tied to the slab and the dock structure. This scope is the structural steel, erected and bolted.

Schedule facts that matter
Area, tonnage if you have it, and the month you want steel in the air are enough to start. Add the fabricator’s release plan if members will arrive in stages.
Dock levelers, trailer equipment, and the roof membrane are not erection work. They can stay on the drawings for context and will be excluded from the price.